Renovating a DC Rowhouse: What to Know First
Renovating a DC rowhouse means working with shared party walls that carry the floors and roof, a narrow footprint, lead paint in anything built before 1978 and, often, a historic district. Plan the structure, permits and lead-safe work together, tell your neighbours before party-wall work, and finish the systems before the finishes.
What makes a rowhouse different?
A rowhouse shares its side walls with the houses next door. In DC those party walls do the heavy lifting: the Historic Preservation Office notes that the front and rear walls of rowhouses are usually not load bearing, and that the side walls carry the weight of the floors and roof down to the foundations.
The walls are usually solid brick, several layers thick. Softer brick was often used for party walls and rear walls, with harder brick on the front. Most rowhouses have a flat roof behind a cornice or parapet. All of this shapes what a renovation can change easily, and what needs an engineer.
Can we open up the inside?
Usually, yes. Because the side walls carry so much of the load, many interior walls can come out. Some still carry weight from above, especially around stairs and where later owners added rooms. Before a wall goes, we check what it supports. Where it carries load, a beam and posts take over, sized by a structural engineer when the job calls for one.
Opening the kitchen to the dining room, moving the stair or adding a bathroom on the second floor are common changes. Each one affects plumbing, ductwork and wiring routes, so they are planned together rather than one room at a time.
What about the party walls and the neighbours?
Work on a party wall affects the house next door. DC’s Department of Buildings requires written notice to neighbouring owners for projects involving party walls or underpinning, sent by certified or registered mail before the permit application is filed. The rule is a notice, not a veto: it does not let a neighbour stop lawful work.
In practice, a conversation before the letter goes a long way. We explain what will happen, how long the noisy parts last and how we protect their side.
Is the house in a historic district?
Many DC rowhouses are. The city’s inventory lists more than 50 historic districts and over 27,000 protected properties. Inside a district, exterior work you need a permit for is reviewed by the Historic Preservation Office. Interior work isn’t reviewed, and most in-kind repairs are approved quickly.
Front windows, doors and porches get a closer look, and large rear additions or anything visible on the roof can go to the review board. Our historic district guide explains what gets reviewed and how long it takes.
Lead paint comes with the age
Almost every DC rowhouse was built before 1978, the year the EPA uses as its cut-off for lead-safe renovation rules. Any paid work that disturbs paint in an older home has to follow lead-safe practices, and in DC the firm doing it must be certified by the Department of Energy and Environment.
We plan containment, dust control and clean-up into the scope from the first visit. Where paint has to go, our certified abatement crew removes it. See lead paint in older homes.
Adding space: up, back or down
Most rowhouses sit in DC’s Residential Flat zones. The 2020 zoning text for the RF-1 zone allows 35 feet and three stories, 60 percent lot occupancy and a 20-foot rear yard, and limits a rear addition to 10 feet past the neighbour’s rear wall. The Board of Zoning Adjustment can grant more by special exception, up to 70 percent lot occupancy. Zoning rules change, so we check the current text for your lot.
When there’s no room to go back or up, the basement is often the answer: a family room, an in-law suite or a rental unit. The basement apartment guide covers what a legal unit needs.
What order does the work go in?
A rowhouse renovation follows the same order as any well-run job:
- Survey and design. Measure the house, look at the structure and agree what changes.
- Permits and reviews. Building, trade and, where needed, historic review and neighbour notices.
- Demolition and lead work. Contained, with the dust kept out of the rest of the house.
- Structure. Beams, posts and any work on the walls or foundations.
- Systems. Plumbing, electrical and heating and cooling, inspected before the walls close.
- Walls and finishes. Insulation, drywall, tile, cabinetry, floors and paint.
- Final inspection and walkthrough. Room by room, with the last items closed out.
Where to go from here
Sources
- DC Historic Preservation Office: Walls and Foundations guidelines
- DC Historic Preservation Review Board: Sustainability Guide
- DC Department of Buildings: Neighbor Notification
- DC Office of Planning: the DC Inventory of Historic Sites
- DC Office of Zoning: 11-E DCMR, Residential Flat zones (2020 text)
- EPA: Lead Renovation, Repair and Painting Program